Taizhou, Zhejiang, China - Distributed Energy Storage Systme in Taizhou Changying Industrial Park

Time: 2022-11-10    Author: nRuiT    Source: This Site    Views: 174

Project Introduction:

Function: Peak shaving and valley filling

Configuration: 5.5MW/11.8MWh

Project completion: June 2022


The box uses 280ah cells,

Single carton 1P16s, capacity 14.3kWh,

The single cluster is 15 boxes with a total capacity of 215kWh

The total capacity of the system is 11.8MW in 55 clusters


Peculiarity:

1.Peak-to-valley price spread arbitrage, intelligent power backup

2.High energy density

3.Load tracking, flexible reverse power protection

4.Remote control & monitoring

5.Battery modular design, easy to install and maintain